Friday, 30 October 2015

Any way to change order of navbar buttons? (ie. back button on far right)



I am loving my 6P, but I almost drop it all the time trying to reach across the screen and hit the back button while holding the phone one handed.

I think this wouldn't be nearly as much of a problem if I could move the back button to the far right position (this is where I had it on my G3 and it was soo much more comfortable to use).

Are there any root/non-root/modifications I can use to rearrange the buttons? :confused:

I have the bootloader unlocked and would happily root if it would enable the ability to move the buttons :)

I know Xposed add-ons will add this functionality eventually, but that could be at least a few weeks/months away.



No comments:

Post a Comment